Stock Info
Stock Price: $0.02Volume: 0
Quotes delayed 15 to 20 minutes. Click Here to View Stock Details
Production Stats
Well Status
- Producing
- Shut In
Daily Production
- Oil
- Gas
Water Flooding at Tekoil and Gas
Water flooding is utilized primarily as a secondary recovery technique, where the primary drive mechanism used to produce the oil (dissolved gas) is depleted. Water is recovered from the water table and injected into the reservoir, displacing the oil towards the target production wells. Because of the limited amount of dissolved gas remaining in solution, pumps are used to bring the oil to surface.
The following animation illustrates Water Flooding in Action: